Hooke Road Running Boards Side Step Bar for 2009-2018 Dodge Ram 1500 & 2019-2024 Ram 1500 Classic Pickup Truck (Crew Cab Only)

★★★★★ 4.2 40 reviews

$259.99
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by dreamlikeupholstery.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$259.99
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Apr 25
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by dreamlikeupholstery.com
Free 30-day returns Details

Product details

Management number 214084296 Release Date 2026/04/12 List Price $104.00 Model Number 214084296
Category
  • 【Application】- Hooke Road running boards with a drop-down step design, compatible with 2009-2018 Dodge Ram 1500 Crew Cab & 2019-2024 Dodge Ram 1500 Classic Crew Cab models
  • 【Easy Access】- Drop-down steps extend 4.72 inches, ensuring effortless vehicle entry and exit. With a 350 lb weight capacity per side, their sleek, curved design contours your truck’s rugged profile, offering robust side and undercarriage protection
  • 【Non-Slip Steps】- These running boards feature 4.72" wide non-slip step pads, designed with diamond-shaped particle pads and stylish stainless steel plates. Wear-resistant and anti-rust, provides a comfortable pedaling feeling while offering enhanced stability and an attractive appearance
  • 【Sturdy Construction】- The side steps are crafted from 2.0" diameter x 0.06" thick steel tubing, 14-gauge (5/64 inch) steel plate, and 18-gauge (1/20 inch) stainless steel plate. Running boards weigh about 62 lbs
  • 【Durable Finish】- Textured black powder coat finish with premium E-coating inside ensures relentless durability and corrosion resistance – ready to tackle any terrain
  • 【Easy Installation】- Mounts securely to factory locations, no drilling required. Swap out existing boards effortlessly to elevate your truck’s rugged appeal. If there are existing factory running boards, please remove them
  • 【Warranty】- Manufacturer warranty for 2-Year from date of purchase. Lifetime customer support from Hooke Road

Color Black
Brand Name Hooke Road
Item Weight 62 Pounds
Manufacturer Hooke Road
Material Type Carbon Steel
Exterior Finish Textured
Item Dimensions 84.49 x 10.37 x 4.72 inches
Included Components 2× Side Steps(Passenger and Driver Side), 6 × Mounting Brackets, Installation Instruction, Mounting Hardware Kit
Weight Capacity Maximum 350 Pounds
Compatible with Vehicle Type 2009-2018 Ram 1500 Crew Cab, 2019-2024 Ram 1500 Classic Crew Cab
Manufacturer Warranty Description Manufacturer warranty for 2-Year from date of purchase. Lifetime customer support from Hooke Road

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.2 out of 5
★★★★★
40 ratings | 16 reviews
How item rating is calculated
View all reviews
5 stars
78% (31)
4 stars
6% (2)
3 stars
3% (1)
2 stars
2% (1)
1 star
11% (4)
Sort by

There are currently no written reviews for this product.